Single-story 98,000 square foot, new construction, combination
office, and research and manufacturing building with a 17,000
square foot expansion of their existing building.
The challenge:
New construction 98,000 square foot
office building with state-of-the-art Building Automation Controls.
17,000 square foot expansion of the
existing occupied facility.
Phase and coordinate installation for
this fast track project.
Design systems for the client’s
specialized manufacturing processes.
Allow flexibility in the system to accommodate
multi-user system access.
Allow flexibility and expandability
for future needs.
Obtain substantial rebates form the local utility, LIPA,
on behalf of our client.
Advance Control Solutions was hired to specify
the BAS system, and work closely with the HVAC contractor and
the General Contractor to value engineer and design solutions
for this project.
Advanced Control Solutions was the controls
contractor hired to install the building automations system
The solution:
Design a Honeywell Xl5000 building automation
control system.
Design a LON network for VAV / FPMB
system consisting of 38 Honeywell VAV controllers.
Direct LON interface to 34 Trane Voyager
roof tops units.
Design and interface to control the
boiler plant and related pumps serving the perimeter baseboard.
Create and design a user-friendly graphical
interface.
Project Summary
Location: Amityville, New York
Project Type: New construction and expansion
of existing building.
Building Size: 115,000 sq. ft. (combined project)
Building Usage: Owner occupied
Objectives: User-friendly system, decrease
maintenance and energy cost, owner comfort.
Design Considerations: Multi-user access system,
fail safe system operation for critical areas.
Major Decision Drivers: Interoperability, flexibility,
expandability.
HVAC Controls: Honeywell 5000 control system
Installation Date: On going
Controls Contractor: Advance Control Solutions
|