Steel Equities Office Building


Project Profile
Three-story 32,600 square foot Class-A office building built in 1964, with an additional 10,800 square foot basement, with a major renovation-taking place 2003/2004.
Building amenities include a 24-hour a day accessible Conference Room.

The challenge:
Retrofit a 43,400 square foot office building with state-of-the-art Building Automation Controls.
Phase and coordinate installation for this fast track project and tenant fit-outs.
Allow flexibility in the system to accommodate multiple tenants.
Create a system with Web–Point Control Access for tenant overtime requests.
Create monthly bills for tenant overtime usage.
Allow flexibility and expandability for future needs.
Obtain substantial rebates form the local utility, LIPA, on behalf of the property owner.


Advance Control Solutions was hired to specify the BAS system, and worked closely with the HVAC contractor and property owner to design and implement solutions for this project.

Advanced Control Solutions was the controls contractor hired to install the building automations system


The solution:
Design and install a Honeywell Xl5000 control system with web-point access.
Design a LON network for VAV / FPMB system consisting of 52 Honeywell VAV controllers and interface to Trane roof tops units.
Design and interface to control the H.W. boiler plant and related pumps serving the perimeter FPMB
Design a single point of entry web-point control system for tenant overtime and billing.
Obtain utility rebate incentive help finance the cost of the project.

Project Summary
Location: Garden City, New York
Project Type: Retrofit
Building Size: 43,400 sq. ft.
Building Usage: Was originally a single-user office environment.
Objectives: User-friendly system, decrease maintenance and energy costs, increase tenant comfort. Allow Tenant Web point control, with tenant overtime billing.
Design Considerations: Web-Point control access and tenant billing.
Major Decision Drivers: Interoperability, flexibility, expandability.
HVAC Controls: Honeywell 5000 control system
Installation Date: On going
Controls Contractor: Advance Control Solutions

 

 

40 J Corbin Ave.
Bayshore, NY 11706
Phone: 631-586-4800
Fax: 631-586-0585
Email: info@advancedcontrolsolutions.com

Today's Hits: 0
Yesterday's Hits: 0
Best Day (7/30/2004) - Hits: 7
Total Hits Since July 27, 2004: 115

© 2004 Advanced Control Solutions. All Rights Reserved
Site designed by ProActive Technology Group

 About Us - Design & Engineering - Soultions - Projects - Clients - Contact